Water and Sanitation Minister, Pemmy Majodina, has called on all the affected municipalities in the Free State to expedite plans to continue to provide water to during the Lesotho Highlands Water Project (LHWP) tunnel shutdown in the next two weeks. The LHWP tunnel will undergo maintenance from 1 October 2024 to 31 March 2025. The Minister engaged with the Executive Mayors of Thabo Mofutsanyana and Fezile Dabi District Municipalities in Bethlehem on Saturday. Majodina was accompanied by Water and Sanitation Deputy Minister David Mahlobo, Deputy Minister of Performance, Monitoring and Evaluation Seiso Mohai, and Free State MEC for Cooperative Governance and Traditional Affairs, Saki Mokoena. Majodina noted that during the outage, there will be no water deliveries from Lesotho to South Africa. 'It is therefore important for municipalities to ensure that water security measures are maintained and various water enforcements mechanisms like water restrictions are applied by the municipalities. 'Although som e municipalities are still lagging behind in terms of their readiness, we as the department, are giving them the support that they need,' Majodina said. The six-months shutdown will jointly be undertaken by the Lesotho Highlands Development Agency (LHDA, which operates and maintains Lesotho section of the LHWP tunnel system, and the Trans-Caledon Tunnel Authority (TCTA) responsible for operation and maintenance of the section within South Africa. The tunnel system requires general inspections and repair works to be conducted at approximately five year intervals to ensure the integrity and reliability of the entire water tunnel system. Due to the tunnel shutdown, 700 million m3 per annum will be transferred in 2024, resulting in a shortfall of 80 million m3 from the normal annual transfer volume. However, the Department of Water and Sanitation has embarked on relief interventions for municipalities along the Caledon River, Wilge River, Vaal River and Rhenoster River. The interventions include the upgradin g of water treatment works, upgrading of raw water pumps, upgrading of abstraction works, the construction of new reservoirs as well as the development of groundwater resources by drilling and equipping boreholes. Majodina noted that while all these projects are under way, some of the municipalities are behind schedule with the implementation of the projects. 'Where necessary, the Department of Water and Sanitation will intervene to support the municipalities to complete the projects which are critical in ensuring sustainable water supply to communities during the tunnel system shutdown,' Majodina said. Source: South African Government News Agency
Municipalities called to prepare for Lesotho water project shutdown
Search
Advertisement
Recent Posts
NamPost launches digital channels
October 19, 2024
WINDHOEK: Namibia Post Limited ( NamPost ) officially launched its MyNamPost Banking App and Internet
BoN reduces repo rate to 7.25 per cent
October 16, 2024
WINDHOEK: The Bank of Namibia ( BoN ) announced a 25 basis point reduction in
Tsumeb business community pledges over N.dollars 600 000 for Tsumeb Copper Festival
October 11, 2024
The Tsumeb business community has pledged a total of N . dollars 670 000
Domestic financial system stable, robust: BoN
October 9, 2024
Windhoek: The Bank of Namibia ( BoN ) has stated that the country ‘ s